Archive for Completed Projects

VA Amarillo Construct Primary Care Clinic

This VA IDIQ MATOC Task Order project will take place at the Thomas E. Creek VA Medical Center, 6010 Amarillo Blvd. West, Amarillo, TX 79106. The project involves constructing a new Primary Care Building which will be approximately 20,000 sf of new construction. Work will include roads and parking lot areas, landscaping, utility work, demolition […]

VA Amarillo Construct Emergency Dept

This project involves the specified renovation of appx. 5,280 SF of existing clinical space and the construction of appx. 2,920 SF of new space, in and around Building 28.  The project will create three new exam rooms, three new trauma rooms, a trauma isolation room, and administrative / clinical space.  The project will take place […]

VA Loma Linda Cancer Center Building

This project involved the construction of a new 18,309 SF two-story stand-alone Cancer Center Building.  The work also included associated site utilities, landscaping, hardscape, site lighting, and other site improvements.

USCG Alameda Street Lighting Repair

This USCG RMACC Task Order project will take place at the United States Coast Guard Island Base Alameda, Alameda, CA 94501.  The project involves the specified demolition of (22) pole mounted luminaires, relocation of (4) pole mounted luminaires, removal of (11) wall pack luminaires, installation of (17) new pole mounted luminaires, and the installation of […]

COE TAC Repair Life Safety Deficiencies B9040

COE Ft Wainwright Alaska Remodel Reception Stations

COE TAC Roof Replacement B-9904

Corps of Engineers SDVOSB MATOC Task Order project. The objective of this project is for the Contractor to provide all labor, materials and equipment necessary to perform a Site Survey, Design and Plan of Work to perform a roof replacement on Building 9904; Madigan Annex, Madigan Army Medical Center, Joint Base Lewis McChord

USCG San Pedro Repair Damaged Electrical Underground Feeder

This USCG RMACC Task Order Solicitation will take place at the United States Coast Guard Base Support Unit Los Angeles / Long Beach, 1001 S. Seaside Avenue, San Pedro, CA.  The project involves the specified repair and replacement work for the underground electrical feeder that was damaged.

VA Big Spring Replace Server Room HVAC

This project will take place at the West Texas VA Health Care System, 300 Veterans Blvd., Big Spring, Texas 79720.  The project involves the specified installation of (2) 8.5 Ton package units on the roof or Room 098-1.  The units shall meet or exceed the performance characteristics of a Lennox RTU-1 (460V/3 Phase). Contractor to cut […]

VA Phoenix Relocate Building 28

This project involves the work specified for moving the existing modular Building 28 to accommodate space for a future Dental Clinic.  The relocation work will include preparation of the new site, provision of new utility connections and relocation of all furniture.